Project

Profile

Help

Actions

Import issues into Planio from CSV files

This is a guide on how you can import tasks, issues, tickets or stories from Comma Separated Values (CSV) files using the importer in Planio. You'll be able to move data between different software packages easily. For instance, you could plan a project in Microsoft Project, and then you could import all the tasks into Planio as issues.

There are two steps to this process. First, you need to prepare a CSV file for import. Second, you have to carry out the import. We’ll cover both in this guide.

Preparing the CSV file

You need to export your tasks, issues or tickets in the CSV format. You can save most Excel sheets as CSV files by clicking on File -> Save As… and then selecting Comma Separated Values as the format from the drop-down menu.

Your CSV file can have the following headers. You’ll find a sample CSV file here: example.csv.

Values Notes
Tracker The tracker of the issue. This is needs to map a name of an existing tracker in your project. You’ll find their names in Administration -> Trackers. If you don't provide this column within the CSV, you may select a tracker for all new issues during the import.
Status The status of the issue. This is needs to map a name of an existing status available for the selected tracker. You’ll find their names in Administration -> Issue statuses. If you don't provide this column within the CSV, the default status will be used.
Subject The subject of the issue. This is required
Description Enter the text describing the issue.
Priority Enter the name of one of the priorities listed in your Planio account. You’ll find their names in Administration -> Enumerations
Category The category of the issue. New categories may created automatically during the import, if need be.
Assignee Enter the First and Last Name, login or email of the person to whom you want to assign the issue. You’ll find those details in Administration -> Users. Make sure the person is a member of the project before assigning them issues via the importer.
Sprint/Milestone Enter the name of the milestone or sprint to which the issue should be assigned. New sprints/milestones may be created automatically during the import, if need be.
Private This selects whether the issue will be private for the assignee or not. Enter 1 to make the issue private or 0 otherwise.
Start date Enter the start date in your preferred date format (e.g. MM/DD/YYYY or DD.MM.YYYY).
Due date Enter the due date in your preferred date format (e.g. MM/DD/YYYY or DD.MM.YYYY).
Estimated time Enter a number for the estimated number of hours (e.g. 15).
% Done Enter a number for the percentage done (e.g. 27).

Please note: You may also import issue relations. This topic is covered below.

Importing the CSV File

Now, you have a CSV file ready for import. The next step is to import it into Planio. You’ll find the button for the Import on the issues page in the sidebar.

Click on Import in the sidebar on the right

Then, select your CSV file using the file picker.

Upload the CSV file using the file picker

On the next page, you can select options for importing the CSV File

Select the options for importing the CSV file based on how your CSV file is formatted

Option Notes
Field separator You can select between comma separated values or semicolon separated values
Field wrapper You can select between double quotes or single quotes.
Encoding You can select the encoding for the CSV file
Date format You can select one of five date formats (YYYY-MM-DD, DD/MM/YYYY, MM/DD/YYY, DD.MM.YYY or DD-MM-YYYY)

First you have to select a target project for the import. Then, you have to map the values from the CSV files to issue fields in Planio. You can select each value from the drop-down menu beside each attribute. You’ll also see a file content preview further down, so you can make sure you’re importing the right data.

Assign each column in the CSV file to an issue field

Once you’re done assigning the values to each field, you can click on import to start the import.

If you encounter any issues, you'll see a page with the errors and the import will not be carried out. You can restart the import once you've fixed the problems in the CSV file.

A list of the errors encountered during the import

If all goes well, you’ll see a list of the imported issues.

You'll see a list of the created issues.

That's how you can import tasks, issues, bugs or stories into Planio using the CSV importer.

Import issue relations

The issue import may also set up issue hierarchies as well as any other issue relation supported by Planio. You may store the relationship information in dedicated columns within your CSV file.

Issue hierarchies

Issue hierarchies may be specified via a parent issue column. Each issue may have exactly on parent issue. To reference already existing issues within your projects, you may use the issue number with a # in front, e.g. #13. To reference issues, which are part of the same CSV, you may either use the row number or you may specify a special "Unique ID" column, which contains the reference text.

Referencing existing issues

Subject Parent ID
Rocket booster firmware upgrade #13
Attach booster to rocket #13

Issue #13 would have been created before the import.

Referencing new issues via row number

Subject Parent ID
Install new rocket booster
Rocket booster firmware upgrade 1
Attach booster to rocket 1

Please note, that numbering starts with the first non-header row.

Referencing new issues via Unique ID column

ID Subject Parent ID
ROCKET-101 Install new rocket booster
ROCKET-201 Rocket booster firmware upgrade ROCKET-101
ROCKET-202 Attach booster to rocket ROCKET-101

Please be aware, that the unique ID may not start with a # sign. Otherwise it would be mistaken for a reference to an existing issue.

Issue relations

Planio supports the following issue relations:

  • Related to
  • Duplicates / Duplicated by
  • Blocks / Blocked by
  • Copied to / Copied from
  • Precedes / Follows

Each issue may be part of many relations, although there are logical restrictions, e.g. an issue cannot block a preceding task. Each relation type should be presented in a different column within the CSV. You may reference other issues using the same three techniques mentioned above. Multiple relations of the same type should be separated by comma.

Please be aware, when using a dedicated Unique ID column, that said ID may not contain commas, since that is used as a separator.

For the follows and precedes relation, you may also add the delay incorporated.

Example defining relations with delay

ID Subject Blocked by Follows
ROCKET-201 Rocket booster firmware upgrade
ROCKET-202 Paint rocket red
ROCKET-203 Attach booster to rocket ROCKET-201 ROCKET-202 2d

The booster may only be attached after the firmware was upgraded and after the paint dried for two day.

Importing the CSV file

Follow the steps described above. When mapping the values from the CSV files to issue fields in Planio, you may also define, which CSV column contains defines which issue relation. When selecting a column for Unique ID, it is assumed, that you're using these value to reference other issues. If that mapping is left blank, it is assumed that row numbers are used.

Assign CSV columns to relationship types

The rest of the import works as described above.

Updated by Jens Krämer over 4 years ago · 79 revisions

Also available in: PDF HTML ODT TXT